Setting up a wind turbine entails quite a number of formalities. Mandated by you, KRUG SARL can supervise or carry out the installation. · Administration Connection to the grid: Included in our fees. We take care of all the procedures involving grid administrators and government departments. This service does not include the installation of meters by EDF. Building permit: KRUG SARL can prepare your application for a building permit; all you have to do is submit it to your mairie (local authority). Consult us!
· Civil works Tower and anchor foundations: The amount of civil works involved obviously depends on the size of the wind turbine and the function of the site, the model and the type of base. KRUG SARL can size it up and carry it out at your demand and according to your constraints. Equipment room: The components of your installation must be protected against the elements. If there is no ready space available, an equipment room can be built on site. Trenches and raceways: Depending on the distance between the wind turbine and the equipment room, house and utility grid, trenches are often the best solution for protecting cables and preserving the landscape.
· Installation Preparing your wind turbine in the workshop: as soon as your wind turbine arrives in our workshop, it undergoes a scrupulous electrical and mechanical verification. Then KRUG SARL creates all the parts necessary for adapting the chosen elements to each other, essentially the wind turbine to the base. The cables are pre-connected to ensure the quality of the installation on-site. Installation of the tower: installation on the civil works and tests on load. Installation of the aerogenerator: on site. Wiring: placing of the electrical accessories: controllers (regulators), chargers, batteries, inverters... Connecting of the cables between the wind turbine and the equipment room, and between the equipment room and the house. Commissioning: Adjustment on-site and setting. |